DSpace Repository

Unit sized transfer batch scheduling with setup times

Show simple item record

dc.contributor.author Can çtinkaya, F.
dc.contributor.author Kayaligil, M.S.
dc.date.accessioned 2022-10-06T09:30:37Z
dc.date.available 2022-10-06T09:30:37Z
dc.date.issued 1992
dc.identifier.issn 03608352 (ISSN)
dc.identifier.uri http://hdl.handle.net/11616/62773
dc.description.abstract Transfer batch scheduling permits the movement of some portion of a job or lot at downstream stages before the entire job is completed at the current stage. This paper considers the two stage flow shop problem of minimizing the total completion time, in which all transfer batches are of unit size for each job. An optimal solution procedure is developed for unit sized transfer batch scheduling with setup times which are independent of the sequence and are separated from the processing times at both stages. © 1992.
dc.source Computers and Industrial Engineering
dc.title Unit sized transfer batch scheduling with setup times


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record