Kumral, M2024-08-042024-08-0420050950-4230https://doi.org/10.1016/j.jlp.2005.04.001https://hdl.handle.net/11616/93998In this research, a safety management system is planned for a mine operation. The objective is to develop a mine production design that will achieve the desired reliability and variance of reliability estimation of system while performing all sub-system functions at a minimum cost. The problem was formulated in an underground mine system containing five sub-systems with varying reliability estimates, estimation variances and feasibilities and solved by genetic algorithms (GA). (c) 2005 Elsevier Ltd. All rights reserved.eninfo:eu-repo/semantics/closedAccessreliability allocationsafetymining production systemsgenetic algorithmsReliability-based optimisation of a mine production system using genetic algorithmsArticle18318618910.1016/j.jlp.2005.04.0012-s2.0-21944454908Q1WOS:000230913700008Q3