Comparison of resource distribution metrics on multi-resource projects

dc.contributor.authorBettemir, Ö. H.
dc.contributor.authorErzurum, T.
dc.date.accessioned2021-12-28T15:55:52Z
dc.date.available2021-12-28T15:55:52Z
dc.date.issued2019
dc.departmentİnönü Üniversitesien_US
dc.description.abstractAbstract: Resource leveling is implemented to reduce the fluctuations of the daily resource usage and the peak resourceusage throughout the construction period. Measurement of peak resource demand is straightforward, whilefluctuations of resource distribution are difficult to evaluate. Therefore, many resource distribution metricsare proposed in order to measure the fluctuations of the resource distribution. In this study, minimummoment, absolute difference, sum of the squares, and minimum deviation resource distribution metrics arecompared by implementing resource distribution on four case study problems obtained from the previousstudies. The case study problems are optimized by exhaustive enumeration in order to ensure that the globaloptimum is obtained for each resource distribution metric. Recently the comparison was conducted for smallprojects. In this study, larger projects are evaluated to examine the effects of the project size and the searchdomain. Optimized resource distribution metrics are compared in terms of peak resource demand and theoverall resource distribution histogram. Similarity to the standard 'S' curve is expected for good fit resourcedistribution. The metrics are also compared in terms of easiness of implementation and computationaldemand. Results of the analyses revealed that minimum moment metric provided lower peak resourcedemand among the other resource distribution metrics. In addition to this, computational demand andeasiness of implementation of the minimum moment metric is the most suitable. The results of this researchcan be beneficial for the project managers through the selection of appropriate resource distribution metric.en_US
dc.identifier.citationBETTEMİR Ö. H,ERZURUM T (2019). Comparison of resource distribution metrics on multi-resource projects. Journal of Construction Engineering, Management & Innovation (Online), 2(2), 93 - 102. Doi: 10.31462/jcemi.2019.02093102en_US
dc.identifier.doi10.31462/jcemi.2019.02093102en_US
dc.identifier.endpage102en_US
dc.identifier.issn2630-5771
dc.identifier.issue2en_US
dc.identifier.startpage93en_US
dc.identifier.trdizinid335402en_US
dc.identifier.urihttps://doi.org/10.31462/jcemi.2019.02093102
dc.identifier.urihttps://hdl.handle.net/11616/44594
dc.identifier.urihttps://search.trdizin.gov.tr/yayin/detay/335402
dc.identifier.volume2en_US
dc.indekslendigikaynakTR-Dizinen_US
dc.language.isoenen_US
dc.relation.ispartofJournal of Construction Engineering, Management & Innovation (Online)en_US
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.titleComparison of resource distribution metrics on multi-resource projectsen_US
dc.typeArticleen_US

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
1493d068-03cb-4b0d-8bd6-1e62c120cf87.pdf
Boyut:
645.39 KB
Biçim:
Adobe Portable Document Format
Açıklama:
Lisans paketi
Listeleniyor 1 - 1 / 1
Küçük Resim Yok
İsim:
license.txt
Boyut:
1.71 KB
Biçim:
Item-specific license agreed upon to submission
Açıklama: