Robustness in mine planning problem: Trade-off between optimality and feasibility

Küçük Resim Yok

Tarih

2011

Yazarlar

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Korza Matbaacilik

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

Mine production scheduling under uncertainty is one of main challenges in mining ventures. Since the values of coefficients in the optimization procedure are obtained in medium of sparse data, sampling and assaying errors, and unknown future events, the implementations based on the deterministic models may lead to destructive consequences to the mining company. In this paper, a robust stochastic optimization (RSO) approach is used to deal with mine production scheduling in a manner that the solution is insensitive to changes in input data. The model was demonstrated on a case study. It was observed that RSO could be executed to solve mine production scheduling problem under an uncertain environment efficiently.

Açıklama

22nd International Mining Congress and Exhibition of Turkey, IMCET 2011 -- 11 May 2011 through 13 May 2011 -- 110210

Anahtar Kelimeler

Economic and social effects, Optimization, Production control, Deterministic models, Input datas, Mine planning, Mine production, Mining companies, Optimization procedures, Stochastic optimizations, Uncertain environments, Scheduling

Kaynak

IMCET 2011 - Proceedings of the 22nd International Mining Congress of Turkey

WoS Q Değeri

Scopus Q Değeri

N/A

Cilt

Sayı

Künye