A new production scheduling approach considering mill requirements

dc.authorscopusid6506350539
dc.contributor.authorKumral M.
dc.date.accessioned2024-08-04T20:04:07Z
dc.date.available2024-08-04T20:04:07Z
dc.date.issued2011
dc.departmentİnönü Üniversitesien_US
dc.description22nd International Mining Congress and Exhibition of Turkey, IMCET 2011 -- 11 May 2011 through 13 May 2011 -- 110210en_US
dc.description.abstractGeo-metallurgical variables control the performances of mining and mineral processing operations. As the fluctuations of geo-metallurgical variables increases, mine production scheduling will be difficult procedure. In conventional approach, the objective is to maximize net present value (NPV) of project. This objective generates descending order of average grade mean. This imposes additional problems on recoveries and throughput in the mill. The problem may be, to some extent, controlled by blending constraint in traditional approach. The blending constraint keeps average grade within upper and lower limits. If there is a very narrow range between upper and lower limits, the average grade of production in each period will be similar. However, the inclusion of this constraint will substantially increase computational time. Therefore, a new model is proposed to tackle with the problem such that computational time is reduced. The idea behind this model is to extract more homogenous metal quantity in the periods instead of maximization of NPV. In new model, the objective function is expressed as a maximin (maximize the minimum) problem. In the case where there is correlation between grade and geo-metallurgical variables, this model generates reasonably good results.en_US
dc.identifier.endpage45en_US
dc.identifier.isbn9786050101034
dc.identifier.scopus2-s2.0-84923081658en_US
dc.identifier.scopusqualityN/Aen_US
dc.identifier.startpage41en_US
dc.identifier.urihttps://hdl.handle.net/11616/92386
dc.indekslendigikaynakScopusen_US
dc.language.isoenen_US
dc.publisherKorza Matbaaciliken_US
dc.relation.ispartofIMCET 2011 - Proceedings of the 22nd International Mining Congress of Turkeyen_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectBlendingen_US
dc.subjectMetallurgyen_US
dc.subjectProduction controlen_US
dc.subjectBlending constraintsen_US
dc.subjectComputational timeen_US
dc.subjectConventional approachen_US
dc.subjectMetallurgical variablesen_US
dc.subjectMineral processingen_US
dc.subjectNet present valueen_US
dc.subjectObjective functionsen_US
dc.subjectTraditional approachesen_US
dc.subjectSchedulingen_US
dc.titleA new production scheduling approach considering mill requirementsen_US
dc.typeConference Objecten_US

Dosyalar