Recovery of Zinc from Flotation Tailings of Lead-Zinc Ore Through a Hydrometallurgical Route
Küçük Resim Yok
Tarih
2025
Dergi Başlığı
Dergi ISSN
Cilt Başlığı
Yayıncı
Springer
Erişim Hakkı
info:eu-repo/semantics/closedAccess
Özet
This study focuses on recovering zinc from flotation tailings through a hydrometallurgical route, including sequential H2SO4 leaching, iron precipitation, and solvent extraction (SX) processes. The effect of leachate concentration, leaching temperature, and time on the zinc recovery was investigated at constant solid/liquid ratio and stirring rate. In order to remove impurities from the pregnant leach solution (PLS), dissolved iron was first precipitated with NaOH solution, and then the dissolved zinc ions were extracted selectively by D2EHPA. Finally, the zinc in the organic D2EHPA phase was stripped into an aqueous phase by utilizing H2SO4 solution to obtain a concentrated and purified zinc solution. It was seen that 93.50% of zinc in the tailings could be leached under optimum leaching conditions. In the SX process, the organic phases, prepared at organic/aqueous ratio (O/A) of 1/1 by volume, could extract 95.3% of the zinc in the pregnant leach solution within 10 min of extraction time. The stripping of 96.83% zinc into the aqueous phase was possible by using a 0.5-M H2SO4 solution, prepared at an O/A ratio of 1/1 by volume. Calculations showed that an 82.65% of cumulative zinc recovery could be achieved through the proposed leaching and SX route.
Açıklama
Anahtar Kelimeler
Solvent-Extraction, Oxide Ore, Silicate Ore, Leaching Zn, D2ehpa, Copper, Dust
Kaynak
Jom
WoS Q Değeri
Q2
Scopus Q Değeri
Q2











