Effects of intensive grinding on the dissolution of celestite in acidic chloride medium

dc.authoridErdemoğlu, Murat/0000-0003-2922-7965
dc.authorwosidAydoğan, Salih/ABF-9776-2021
dc.authorwosidErdemoğlu, Murat/AAA-9964-2020
dc.contributor.authorErdemoglu, Murat
dc.contributor.authorAydogan, Salih
dc.contributor.authorGock, Eberhard
dc.date.accessioned2024-08-04T20:31:03Z
dc.date.available2024-08-04T20:31:03Z
dc.date.issued2009
dc.departmentİnönü Üniversitesien_US
dc.description.abstractEffect of intensive grinding on the dissolution of celestite in acidic barium chloride and sodium chloride solutions was studied by investigating structural changes occurred during milling. Complete dissolution of the celestite was achieved within 25 min by milling in a planetary ball mill in which ball to ore ratio is 10. But, increasing grinding time and ball to ore ratio diminished the dissolution rate. X-ray amorphous phase content and XRD breadths increased and XRD line reflection intensity decreased with increasing of grinding time, and celestite does not undergo a considerable phase transformation during milling. SEM micrographs showed that how prolonged milling results in an increasing degree of agglomeration and a reduced amount of fines. Additionally, the ground samples were heated at elevated temperatures and then re-ground under earlier grinding conditions. Structural, morphological and dissolution characteristics of the samples obtained by each of the three treatments were also evaluated. It was concluded that high energy milling for short times increases the dissolution rate of celestite. But, increase in the particle size due to agglomeration or compactness of the particles as a result of impact stress predominant in planetary ball milling decreased the leaching rate, as grinding time and ball to ore ratio in the mill were increased. (C) 2008 Elsevier Ltd. All rights reserved.en_US
dc.identifier.doi10.1016/j.mineng.2008.03.004
dc.identifier.endpage24en_US
dc.identifier.issn0892-6875
dc.identifier.issue1en_US
dc.identifier.scopus2-s2.0-56249114484en_US
dc.identifier.scopusqualityQ1en_US
dc.identifier.startpage14en_US
dc.identifier.urihttps://doi.org/10.1016/j.mineng.2008.03.004
dc.identifier.urihttps://hdl.handle.net/11616/94695
dc.identifier.volume22en_US
dc.identifier.wosWOS:000262141100003en_US
dc.identifier.wosqualityQ1en_US
dc.indekslendigikaynakWeb of Scienceen_US
dc.indekslendigikaynakScopusen_US
dc.language.isoenen_US
dc.publisherPergamon-Elsevier Science Ltden_US
dc.relation.ispartofMinerals Engineeringen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectCelestiteen_US
dc.subjectDissolutionen_US
dc.subjectIntensive grindingen_US
dc.subjectPlanetary ball millen_US
dc.titleEffects of intensive grinding on the dissolution of celestite in acidic chloride mediumen_US
dc.typeArticleen_US

Dosyalar