Concurrent optimization of mine block sequencing and cut-off grades

Küçük Resim Yok

Tarih

2011

Yazarlar

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Korza Matbaacilik

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

Mine block sequencing, ore-waste discrimination and determination of production rates are main sub-problems of mine production scheduling. The objective is to maximize net present value under access and capacity constraints. The problems are currently solved in a sequential way: First, production rates and corresponding costs are initiated. Using this cost structure, a cut-off schedule is determined. Finally, the block sequencing is executed for marginal cut-off grades and pre-defined production rates. This process is repeated until maximum net present value (NPV) is found. However, these problems should be solved simultaneously instead of iterative procedure because production rates and cut-offs cannot be known without block sequencing. In this paper, ore-waste discrimination and block sequencing are optimized concurrently through mixed integer programming (MIP) model. This procedure also considers relationship between capacities and accessibility. To observe the performance of new model, a case study is implemented. An increase in NPV is observed.

Açıklama

22nd International Mining Congress and Exhibition of Turkey, IMCET 2011 -- 11 May 2011 through 13 May 2011 -- 110210

Anahtar Kelimeler

Production control, Scheduling, Capacity constraints, Cost structure, Cut-off grade, Mine production, Mixed integer programming model, Net present value, Production rates, Sub-problems, Integer programming

Kaynak

IMCET 2011 - Proceedings of the 22nd International Mining Congress of Turkey

WoS Q Değeri

Scopus Q Değeri

N/A

Cilt

Sayı

Künye