Concurrent optimization of mine block sequencing and cut-off grades
dc.authorscopusid | 6506350539 | |
dc.contributor.author | Kumral M. | |
dc.date.accessioned | 2024-08-04T20:04:07Z | |
dc.date.available | 2024-08-04T20:04:07Z | |
dc.date.issued | 2011 | |
dc.department | İnönü Üniversitesi | en_US |
dc.description | 22nd International Mining Congress and Exhibition of Turkey, IMCET 2011 -- 11 May 2011 through 13 May 2011 -- 110210 | en_US |
dc.description.abstract | Mine block sequencing, ore-waste discrimination and determination of production rates are main sub-problems of mine production scheduling. The objective is to maximize net present value under access and capacity constraints. The problems are currently solved in a sequential way: First, production rates and corresponding costs are initiated. Using this cost structure, a cut-off schedule is determined. Finally, the block sequencing is executed for marginal cut-off grades and pre-defined production rates. This process is repeated until maximum net present value (NPV) is found. However, these problems should be solved simultaneously instead of iterative procedure because production rates and cut-offs cannot be known without block sequencing. In this paper, ore-waste discrimination and block sequencing are optimized concurrently through mixed integer programming (MIP) model. This procedure also considers relationship between capacities and accessibility. To observe the performance of new model, a case study is implemented. An increase in NPV is observed. | en_US |
dc.identifier.endpage | 40 | en_US |
dc.identifier.isbn | 9786050101034 | |
dc.identifier.scopus | 2-s2.0-84923073978 | en_US |
dc.identifier.scopusquality | N/A | en_US |
dc.identifier.startpage | 37 | en_US |
dc.identifier.uri | https://hdl.handle.net/11616/92387 | |
dc.indekslendigikaynak | Scopus | en_US |
dc.language.iso | en | en_US |
dc.publisher | Korza Matbaacilik | en_US |
dc.relation.ispartof | IMCET 2011 - Proceedings of the 22nd International Mining Congress of Turkey | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Production control | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Capacity constraints | en_US |
dc.subject | Cost structure | en_US |
dc.subject | Cut-off grade | en_US |
dc.subject | Mine production | en_US |
dc.subject | Mixed integer programming model | en_US |
dc.subject | Net present value | en_US |
dc.subject | Production rates | en_US |
dc.subject | Sub-problems | en_US |
dc.subject | Integer programming | en_US |
dc.title | Concurrent optimization of mine block sequencing and cut-off grades | en_US |
dc.type | Conference Object | en_US |